Three thousand bicycle spaces in the transition zones of Chillathon Antwerpen
For Chillathon Antwerpen 2026, we provided 3,000 bicycle parking spaces in the triathlon transition zones. The facilities were spread across three locations, all along the quays in Antwerpen. The one-day event had 3,000 participants. We supplied bicycle racks of the Sport model and took care of transport, as well as setup and dismantling.
Model Sport for participants' racing bikes
The organisation chose model Sport because the participants mainly used racing bikes. The choice of equipment therefore matched the type of bike in use. With this model, the bike is hung by its saddle over the crossbar. The racks were used as part of the transition zones, where participants change from one discipline to the next during the triathlon.
The function of the racks was therefore directly linked to the course of the race. The bike spaces were intended for the participants and their racing bikes. At all three locations we used the same model, with a combined capacity of 3,000 spaces.
All three locations set up within two hours
The space available along the quays was limited. Our work therefore required close attention to the layout and the activities at each location. Thanks to our modular system, we set up all three facilities within two hours. This time covered the complete set-up at all three locations combined.
In addition to supplying the bicycle racks, we arranged transport to the locations and the dismantling afterwards. Our assignment therefore covered both the materials for the transition zones and the on-site execution.



Do you also need bicycle parking for your event?
Are you organising a triathlon and looking for bicycle racks for the transition zones? We would be happy to discuss the capacity you need, the space available and the planning of transport, set-up and dismantling.
For this event we used the model
These are the services we provided
Transport
Smart transport for every situation. No project is the same. That is why we always tailor the transport to the location and the project.
Assembly and Dismantling
Setup according to the correct standards. For every project, we work in accordance with the latest guidelines. This begins at the planning stage and ends at handover.