Bicycle racks at three rest stops of the Vuelta toertocht 2026
For the Vuelta toertocht 2026, we provided 1,000 bicycle parking spaces, spread across three refreshment points. A total of 3,000 cyclists took part in the one-day ride. The participants mainly rode road bikes. For this reason, the organisation chose bicycle racks of the Sport model. We took care of the transport as well as the set-up and dismantling at all three locations.
Model Sport for racing bikes
At a refreshment point, participants briefly get off their bikes for a stop. Model Sport offers a suitable solution for this: the racing bike is hung by its saddle over the crossbar. This allows participants to park their bikes while they visit the refreshment station.
The distribution of the racks across the three locations depended on the position of the refreshment stations along the route. The number of kilometres covered before reaching a station played a role in this. The 1,000 spaces made up the combined capacity of the three parking areas.
Planning the set-up around a 09:00 start
The tour started at 09:00. The challenge for our team was dividing the available time between the three refreshment points along the route. This involved setting up several locations within the schedule of the same event day.
Transport and set-up had to be coordinated, with attention to the location of each refreshment stop. In addition to providing enough bicycle racks, this assignment therefore required a work schedule covering three separate locations. After the tour had finished, we also took care of dismantling the bicycle racks.



Do you also need bicycle parking spaces for your event?
Are you organising a cycling tour with several refreshment points? We are happy to advise on the use of the Sport model, the distribution of bicycle parking spaces along your route, and the planning of transport, set-up and dismantling.
For this event we used the model
These are the services we provided
Transport
Smart transport for every situation. No project is the same. That is why we always tailor the transport to the location and the project.
Assembly and Dismantling
Setup according to the correct standards. For every project, we work in accordance with the latest guidelines. This begins at the planning stage and ends at handover.